Installation Requirement

1. Installation environment: Install the lift in the dry place with normal temperature, keep the location bright enough
2. Concrete: Concrete must be thickness 150mm minimum and without reinforcing steel bars,and must be dried totally before the installation;  Concrete must be in good condition and must be of test strength 3,000psi (200kg/cm²) minimum; Floors must be level and no cracks; Make sure the space is enough for the model installation.
3. POWER SUPPLY: The electrical source must be 2.2KW minimum. The source cable size must be 2.5mm² and in good condition of contacting with floor.
4. AIR SUPPLY: Air pressure requirement: 0.5Mpa~0.8Mpa, Air line size ¢8×¢6 and ¢6×¢4.